    How do you connect to the Events provider in sitefinity with the Telerik radscheduler control?

    When I add the control to the page, the provider name defaults to Integrated and I cannot change it.

    I have the following fields set:

    DataStartField = Event_Start
    DataKeyField = ID
    DataEndField = Event_End
    DataSubjectField = Title
  2. Ivan Dimitrov
    Ivan Dimitrov avatar
    16072 posts
    Registered:
    12 Sep 2017
    28 Mar 2009
    Link to this post
    Hi derek,

    EventsScheduleView control loads all events automatically. The provider is set by default to Events from
    DefaultContentProvider which gets default provider used by events manager.

    Best wishes,
    Ivan Dimitrov
    the Telerik team

    Check out Telerik Trainer , the state of the art learning tool for Telerik products.
  3. derek
    derek avatar
    37 posts
    Registered:
    15 Jun 2007
    30 Mar 2009
    Link to this post
    I was asking about the RadScheduler control, not the EventsScheduleView control.
  4. Ivan Dimitrov
    Ivan Dimitrov avatar
    16072 posts
    Registered:
    12 Sep 2017
    30 Mar 2009
    Link to this post
    Hi derek,

    In this case you should implement a Data Provider , Implementing A Provider. Then you should bind the controls to a data source.